Our Projects
Jerky Outlet Mobil Station
Standish, MI
This project in Standish, Michigan features a new convenience store and pumps. The station continued to operate during construction.
Size: 3,042 Square Feet
Year Built: 2014
This project in Standish, Michigan features a new convenience store and pumps. The station continued to operate during construction.
Size: 3,042 Square Feet
Year Built: 2014
Sugar Springs
Gladwin, MI
A pre-engineered steel and masonry addition added lockers, restrooms and 1,994 square foot indoor pool.
Size: 9,708 Square Feet
Year Built: 2011
A pre-engineered steel and masonry addition added lockers, restrooms and 1,994 square foot indoor pool.
Size: 9,708 Square Feet
Year Built: 2011
Bishop Baraga Catholic Elementary School
Cheboygan, MI
FED completed this new 34,000 square foot pre-engineered steel building which features a worship facility complete with chapel, thirteen classrooms, library, gymnasium/multi-purpose room, offices, kitchen, storage and restrooms.
Size: 34,000 Square Feet
Year Built: 2005
FED completed this new 34,000 square foot pre-engineered steel building which features a worship facility complete with chapel, thirteen classrooms, library, gymnasium/multi-purpose room, offices, kitchen, storage and restrooms.
Size: 34,000 Square Feet
Year Built: 2005
Ziegler Fiat-Maserati
Schaumburg, IL
This 15,415 square foot dealership features a Fiat showroom, Maserati showroom, Alpha Romeo showroom and six bay service department.
Size: 15,415 Square Feet
Year Built: 2014
This 15,415 square foot dealership features a Fiat showroom, Maserati showroom, Alpha Romeo showroom and six bay service department.
Size: 15,415 Square Feet
Year Built: 2014
Northwood University Practice Facility
Midland, MI
This 210 feet wide by 280 feet long clear span, open web truss steel building houses a half size football practice field and indoor track at Northwood University.
Size: 58,000 Square Feet
Year Built: 2012
This 210 feet wide by 280 feet long clear span, open web truss steel building houses a half size football practice field and indoor track at Northwood University.
Size: 58,000 Square Feet
Year Built: 2012
Reed City Church of the Nazarine
Reed City, MI
This new worship, fellowship and Christian educational facility features a multi-purpose sanctuary with seating for 500. The educational portion of the building is 90 feet by 110 feet with an eave height of 15 feet.
Size: 20,000 Square Feet
Year Built: 2006
This new worship, fellowship and Christian educational facility features a multi-purpose sanctuary with seating for 500. The educational portion of the building is 90 feet by 110 feet with an eave height of 15 feet.
Size: 20,000 Square Feet
Year Built: 2006
Commerce United Methodist Church
Commerce Township, MI
This two story, 23,968 square foot addition to the existing 12,152 square foot facility features sanctuary seating for 440, daycare space, classrooms and offices.
Size: 23,968 Square Feet
Year Built: 2008
This two story, 23,968 square foot addition to the existing 12,152 square foot facility features sanctuary seating for 440, daycare space, classrooms and offices.
Size: 23,968 Square Feet
Year Built: 2008
Planet Rock
Madison heights, MI
This STAR pre-engineered building project is 50 feet tall and serves as an addition and remodel creating a state of the art rock climbing facility, pro-shop and classrooms.
Size: 22,000 Square Feet
Year Built: 2014
This STAR pre-engineered building project is 50 feet tall and serves as an addition and remodel creating a state of the art rock climbing facility, pro-shop and classrooms.
Size: 22,000 Square Feet
Year Built: 2014
New Covenant Ministries
Clio, MI
This new church features sanctuary space and classrooms/group rooms, two levels with elevator, wrap around group area and more. You can see this project from I-75!
Size: 68,500 Square Feet
Year Built: 2002
This new church features sanctuary space and classrooms/group rooms, two levels with elevator, wrap around group area and more. You can see this project from I-75!
Size: 68,500 Square Feet
Year Built: 2002
Feeny Chrysler Dodge Jeep
Gaylord, MI
FED completed this build with a Nucor Pre-Engineered Metal Building. The dealership features new wash bay, quick lube, offices and customer service area.
Size: 4,000 Square Feet
Year Built: 2014
FED completed this build with a Nucor Pre-Engineered Metal Building. The dealership features new wash bay, quick lube, offices and customer service area.
Size: 4,000 Square Feet
Year Built: 2014
Fragrance Christ Ministries
Flushing, MI
FED remodeled this space which features a sanctuary, fellowship area, group room and office space. The church also features a new exterior look with coordinated roof lines and a new entryway.
Size: 9,360 Square Feet
Year Remodeled: 2015 Year Originally Built: 1883
FED remodeled this space which features a sanctuary, fellowship area, group room and office space. The church also features a new exterior look with coordinated roof lines and a new entryway.
Size: 9,360 Square Feet
Year Remodeled: 2015 Year Originally Built: 1883
Merril Fabricators
Alma, MI
A new industrial manufacturing and crane pre-engineered steel building measuring 80 feet by 120 feet with a 49 foot low eave. Merrill Fabricators specialize in large metal fabrication in the aviation, government and windmill industries.
Size: 17,680 Square Feet
Year Built: 2005
A new industrial manufacturing and crane pre-engineered steel building measuring 80 feet by 120 feet with a 49 foot low eave. Merrill Fabricators specialize in large metal fabrication in the aviation, government and windmill industries.
Size: 17,680 Square Feet
Year Built: 2005
Hoover Precision Products
Sault Ste Mariem MI
This project was an addition to an existing facility in Sault Ste Marie. The pre-engineered building measures 175’ x 125’ and is a crane building with one ISO 8 clean room.
Size: 21,875 Square Feet
Year Built: 2013
This project was an addition to an existing facility in Sault Ste Marie. The pre-engineered building measures 175’ x 125’ and is a crane building with one ISO 8 clean room.
Size: 21,875 Square Feet
Year Built: 2013
Ziegler Chrysler
Kalamazoo, MI
This new automotive dealership is the new corporate headquarters for Harold Zeigler Auto Group and features state of the art office space, conference room, fitness facility and more.
Size: 21,601 Square Feet
Year Built: 2011
This new automotive dealership is the new corporate headquarters for Harold Zeigler Auto Group and features state of the art office space, conference room, fitness facility and more.
Size: 21,601 Square Feet
Year Built: 2011
Oliver Woods Retirement Village
Owosso, MI
This new 49,090 square foot, 60 bed assisted living facility includes a commercial kitchen, dining area and lounge for residents.The exterior appearance of the building features brick accents,bay windows and vinyl siding.
Size: 49,090 Square Feet
Years Built: 2004, 2006 & 2012
This new 49,090 square foot, 60 bed assisted living facility includes a commercial kitchen, dining area and lounge for residents.The exterior appearance of the building features brick accents,bay windows and vinyl siding.
Size: 49,090 Square Feet
Years Built: 2004, 2006 & 2012
Brown Machine
Beaverton, MI
FED completed this addition to their existing facility. A chemical storage building was also relocated and the addition was connected to the main complex.
Size: 12,750 Square Feet
Year Built: 2015
FED completed this addition to their existing facility. A chemical storage building was also relocated and the addition was connected to the main complex.
Size: 12,750 Square Feet
Year Built: 2015
Valley Family Church
Kalamazoo, MI
FED built this addition totaling 86,164 square feet which includes seating for 1,500 in the main worship area, youth worship areas, coffee café book store and office space. This is a pre-engineered NUCOR building.
Size: 86,164 Square Feet
Year Built: 2009
FED built this addition totaling 86,164 square feet which includes seating for 1,500 in the main worship area, youth worship areas, coffee café book store and office space. This is a pre-engineered NUCOR building.
Size: 86,164 Square Feet
Year Built: 2009
Waypoint
Clarkston, MI
FED completed this remodel of an existing car dealership to create
WayPoint Church in Clarston, Michigan. The new space is multi-functional and provides much needed space for the growing congregation.
Size: 15,000 Square Feet
Year Built: 2014
FED completed this remodel of an existing car dealership to create
WayPoint Church in Clarston, Michigan. The new space is multi-functional and provides much needed space for the growing congregation.
Size: 15,000 Square Feet
Year Built: 2014
Ziegler of Downers Grove
Downers Grove, IL
FED completed this 34,000 square foot dealership featuring 4 Bay Quick Lube, 18 Bay Service Center and Showroom. This project gave the dealership a completely new appearance and atmosphere.
Size: 34,000 Square Feet
Year Built: 2011
FED completed this 34,000 square foot dealership featuring 4 Bay Quick Lube, 18 Bay Service Center and Showroom. This project gave the dealership a completely new appearance and atmosphere.
Size: 34,000 Square Feet
Year Built: 2011
Gull Lake Marina
Coopersville, MI
This project in Standish, Michigan consisted of a new boat rack storage building, a boat canopy building, a boat condo building, and remodeling the standing structure into a showroom.
Size: 4,000 & 11,900 Square Feet
Year Built: 2016
This project in Standish, Michigan consisted of a new boat rack storage building, a boat canopy building, a boat condo building, and remodeling the standing structure into a showroom.
Size: 4,000 & 11,900 Square Feet
Year Built: 2016
Briarwood Assisted Living
Allegan, MI
FED built this 31,668-square foot, 39 bed assisted living facility which features a commercial kitchen, dining area and lounge for residents. The exterior appearance of the building has a touch of home with brick accents and bay windows.
Size: 31,668 Square Feet
Years Built: 2008 & 2012
FED built this 31,668-square foot, 39 bed assisted living facility which features a commercial kitchen, dining area and lounge for residents. The exterior appearance of the building has a touch of home with brick accents and bay windows.
Size: 31,668 Square Feet
Years Built: 2008 & 2012
Spicer’s Boat City
Houghton Lake, MI
This Nucor structure is a new boat storage facility for Spicer’s Boat City located in Houghton Lake, Michigan.
Size: 11,997 Square Feet
Year Built: 2012
This Nucor structure is a new boat storage facility for Spicer’s Boat City located in Houghton Lake, Michigan.
Size: 11,997 Square Feet
Year Built: 2012
The Tabernacle Church
Buckley, MI
This building is currently being built by FED and features a worship space for up to 300, a cafe, a nursery, and toddler rooms. This is a pre-engineered STAR metal building.
Size: 9,960 Square Feet
Year Built: 2016
This building is currently being built by FED and features a worship space for up to 300, a cafe, a nursery, and toddler rooms. This is a pre-engineered STAR metal building.
Size: 9,960 Square Feet
Year Built: 2016
Renze Ford
Manistique, MI
Modeled after the image provided by Ford, this new dealership will feature a NUCOR metal building with show room, finance offices, and a service lane.
Size: 15,000 Square Feet
Year Built: In Progress
Modeled after the image provided by Ford, this new dealership will feature a NUCOR metal building with show room, finance offices, and a service lane.
Size: 15,000 Square Feet
Year Built: In Progress
Cary Pioneer Farms
Alma, MI
Cow barn is 14,950 square feet and feature open sides, metal roofing and specialized concrete structures.
Size: 14,950 Square Feet
Year Built: 2004
Cow barn is 14,950 square feet and feature open sides, metal roofing and specialized concrete structures.
Size: 14,950 Square Feet
Year Built: 2004
East Pickard Medical Office
Mt Pleasant, MI
Two new buildings were completed by FED, each consisting of 8,520 square feet. Each building was completed with conventional construction featuring brick and stone veneer accents. The first building is a new medical office and the second is available for office space.
Size: 17,040 Square Feet
Year Built: 2013
Two new buildings were completed by FED, each consisting of 8,520 square feet. Each building was completed with conventional construction featuring brick and stone veneer accents. The first building is a new medical office and the second is available for office space.
Size: 17,040 Square Feet
Year Built: 2013
MBS International Airport
Freeland, MI
FED Corporation erected this hangar at MBS International Airport. The hangar measures 250 feet by 160 feet and features office and maintenance space for aircraft.
Size: 40,000 Square Feet
Year Built: 2008
FED Corporation erected this hangar at MBS International Airport. The hangar measures 250 feet by 160 feet and features office and maintenance space for aircraft.
Size: 40,000 Square Feet
Year Built: 2008
Water’s Edge United Methodist
New Buffalo, MI
FED completed this new church that has ample space to provide affordable daycare, banquet and wedding event services complete with commercial kitchen, a larger worship area and outdoor patio.
Size: 10,080 Square Feet
Year Built: 2014
FED completed this new church that has ample space to provide affordable daycare, banquet and wedding event services complete with commercial kitchen, a larger worship area and outdoor patio.
Size: 10,080 Square Feet
Year Built: 2014
Moran Iron Works, Inc
Onaway, MI
This 24,000 square foot construction added two bays of 50 ton cranes to this steel fabrication facility.
Size: 24,000 Square Feet
Year Built: 2011
This 24,000 square foot construction added two bays of 50 ton cranes to this steel fabrication facility.
Size: 24,000 Square Feet
Year Built: 2011
Lyon Township Fire & EMS
Lyon Township, MI
This Design/Build project will consist of three first responder vehicle bays, a new office, kitchen, banquet/ meeting space, and a dispatch room.
Size: 14,800 Square Feet
Year Built: Currently Under Construction
This Design/Build project will consist of three first responder vehicle bays, a new office, kitchen, banquet/ meeting space, and a dispatch room.
Size: 14,800 Square Feet
Year Built: Currently Under Construction